HC Deb 02 May 1991 vol 190 c279W
Mr. Gareth Wardell

To ask the Secretary of State for Wales if he will publish the criteria he has used to determine delaying the installation of temporary traffic lights at the Earlswood roundabout until 1993.

Sir Wyn Roberts

The traffic signals are to be provided as part of an improvement to Earlswood roundabout and will be permanent, operating on a part-time basis at peak periods. The roundabout is being used as a temporary access for the M4 construction between Earlswood and Lonlas. Should the improvement and the traffic lights be installed now, serious contractual problems would result.