HC Deb 19 March 1991 vol 188 c54W
Mr. Gill

To ask the Secretary of State for Transport in respect of the M54 in Shropshire what was the original cost, the cost of subsequent repairs and the lowest tender for the orginial construction to have been in tarmacadam rather than concrete.

Mr. Chope

The original construction cost was £26,248,992. Had the lowest tenders for blacktop construction been accepted the extra cost would have been £881,883.

Repair costs to date including those programmed for 1990–91 total £5,303,500. The latter includes bridgeworks and covers part of the Staffordshire section for which Shropshire county council is responsible.