HC Deb 13 June 1991 vol 192 cc644-7W
Mr. Fatchett

To ask the Secretary of State for Education and Science what criteria are used for the determination of capital allocations for those schools which have held grant-maintained status for more than one year.

Mr. Eggar

The same criteria for determining capital allocations apply to the 29 schools that have been grant maintained for more than a year as those which have entered the sector more recently. All schools receive a formula allocation for small capital works based on their pupil numbers. In addition, all schools can bid for named capital projects. Priority in these allocations has been given to schools' most pressing needs. These include projects related to the health and safety of pupils, and to projects concerned with the introduction of the national curriculum, especially in science and technology.

Mr. Fatchett

To ask the Secretary of State for Education and Science if he will set out the capital allocation for each grant-maintained school for(a) 1990–91, where appropriate and (b) 1991–92 and the purpose of each capital allocation.

Mr. Eggar

The table lists the allocations for named capital projects for grant-maintained schools to begin in the two years. I shall write to the hon. Member when decisions are taken about further allocations for 1991–92.

In addition to named project allocations, each grant-maintained school is eligible to claim an amount of capital grant calculated according to a formula which takes account of the number of pupils on roll. The grant is used for small capital works and the purchase of equipment. For 1990–91 the formula was £13,000 plus £6 per pupil on roll. For 1991–92 the formula is £19,000 plus £9 per pupil on roll.

School Amount allocated Purpose of allocation
£'000s £'000s
Projects beginning in
1990–91 1991–92
Beechen Cliff school 480 Kitchen and dining room
320 Technology block
Bishopshalt school 206 Science block extension
Bournemouth grammar school 300 Repairs (including roof repairs and rewiring)
Bridgewater Hall school 65 Boiler replacement
Bullers Wood school for girls 228 Refurbishment and extension of 3 laboratories
Cardinal Vaughan memorial school 219 Roof replacement
Carre's grammar school 630 Technology and laboratories extension
Castle Hall GM school 11 Removal of asbestos
105 Roof renewal and concrete frame repairs
Claremont high school 328 Repairs and renovation of laboratories
120 Technology rooms and health and safety
Colyton grammar school 950 New technology block
Ecclesbourne school 400 Repairs (including re-roofing and rewiring)
Francis Bacon school 105 Modern language classrooms
Handsworth grammar school for boys 953 New science block
Heckmondwike grammar school 198 Repairs
252 Technology refurbishment
Hendon school 180 200 Window replacement and lab refurbishment
Lancaster Royal grammar school 155 Rewiring, room conversion and new washrooms
London nautical school 100 Repairs
50 Rewiring
London oratory school 151 Renovation to laboratories
216 Design and technology
Long Field high school 236 Roof repairs
Netherthorpe school 65 Staff room and administration
Old Swinford hospital 35 Repairs
500 Science laboratories
Pate's grammar school 1,500 Replace existing accommodation
Queen Elizabeth's GM school for boys 261 Repairs and boilder replacement
Queen Elizabeth's grammar school 100 503 Replace temporary accommodation
Queensbury school 57 Repairs and health and safety
Ribston Hall high school 295 New technology unit
St. Francis Xavier's college 122 Roof repairs and asbestos removal
200 Repairs
Skegness grammar school 92 Classroom improvements
63 Modernise kitchen and canteen
Small Heath school 50 Roof repairs and rewiring
105 Replace windows and improve maths suite
Southfield school for girls 650 Technology block

School Amount allocated Purpose of allocation
£'000s £'000s
Projects beginning in
1990–91 1991–92
Southlands school 46 Conversion to design and technology
113 Re-roofing
St. James' CE school 650 Replace classroom block
The Grammar School for Girls, Wilmington 44 Repairs
45 Conversion to CDT
The Kings school 128 2 new classrooms
Watford boys grammar school 80 Re-roofing
Wilson's school 200 Technology workshop and room conversion

Note: The figures exclude £138,000 of support for emergency projects allocated during 1990–91.