HC Deb 10 May 1989 vol 152 c429W
Mr. Franks

To ask the Secretary of State for Transport why, during the recent bank holiday weekend, only one lane of the M6 northbound was open between junctions 16 and 17; how long it was closed prior to that weekend; when the present contraflow was set up increasing the number of lanes open in both directions to two; and whether he will ensure that where possible road works do not take place over bank holidays unless absolutely necessary and that, when such occasions arise, at least two lanes are open.

Mr. Peter Bottomley

One-lane working on the northbound carriageway was necessary from 9 pm to midnight on Sunday 30 April to set up the amended contraflow. Otherwise, two lanes have been available in both directions except when the contraflow system on the southbound carriageway was installed at the start of the contract on 15 April. We shall whenever possible ensure that road works do not take place at bank holidays, particularly on major holiday routes. If work has to be done, we shall keep as much road space open as possible.