HC Deb 11 January 1988 vol 125 c23W
Mr. John Browne

To ask the Secretary of State for Wales what is the design traffic flow for the improvement on the A55 at Conwy; and what are the total estimated costs.

Mr. Wyn Roberts

The design traffic flows through Conwy tunnel based on the 1981 forecast for the 16-hour two-way August peak flows in the design year 2003 were:

  • High growth 36,590 vehicles/day
  • Low growth 29,730 vehicles/day

The total estimated cost for the improvement of the A55 at Conwy is £160 million.