§ Mr. MuddTo ask the Secretary of State for Transport if he will list all the motorway and trunk road contracts in England with a works cost of £1 million or more which his Department intends to award in 1988–89 showing, in each case, the total value of the contract and the expenditure likely to be incurred in that year.
§ Mr. Peter BottomleyThe table lists schemes which we plan to start in 1988–89. The list is provisional and currently under review. Actual starts 1988–89 may differ from this list as progress is dependent on outstanding statutory procedures and other factors. Other schemes not on the list may start in 1988–89 if progress with statutory procedures is faster than currently expected.
3W
Route Title Works cost estimate Forecast expenditure in 1988–89 (B) Schemes for which some statutory procedures have not been completed M3 Compton to Bassett widening 27 10 A30 Launceston to Plusha 6 3 A35 Axminster Bypass 6 0 A36 Beckington Bypass 4 1 A36 Codford Bypass 2 1 A43 Blisworth Bypass 11 0 A303 Ilchester to South Petherton 9 2 A435 Sedgeberrow Bypass 1 1 A604 Ml to Al Link 60 15 A650 Drighlington Bypass 5 1 A696 Woolsington Bypass 9 2 Sub total (b) 11 Schemes 140 36 (c) In addition, further contracts are expected to be let on schemes which will be under construction at 31 March 1988 as follows:
Route Title Contract cost estimate (£ million) M40 Banbury Bypass Contract 2 23 M40 Banbury Bypass Contract 4 45 A2 London Boundary to M2 Improvement Contract 4 2 A19 Peterlee Grade Separated Junction Stage 2 3 Sub total (c) 4 Contracts 73
§ Mr. MuddTo ask the Secretary of State for Transport if he will list in the form of his answer of 2 April 1987,
£ million Route Title Works cost estimate Estimated date for start of works (A) Schemes which had completed all their statutory procedures: M62 Eastbound climbing lane (Junctions 21–22) 3 Spring 1988 M62 Westbound climbing lane (Junctions 24–25) 2 Spring 1988 A2 London boundary to M2 Improvement Contract 4 1 Autumn 1988 Sub total (a) 6 (B) Schemes for which statutory procedures has still to be completed: M3 Compton to Bassett widening 27 Early 1989 A6 Barton bypass 6 Mid 1988 A27 Penvensey bypass 6 Mid 1988 A41 Bicester bypass 3 Autumn 1988 A52 Nottingham outer ring road Abbey Street grade separated junction 4 Spring 1988 A140 Dickleburgh bypass 2 Spring 1989 A435/A422 Alcester bypass 7 Autumn 1988 A696 Woolsington bypass 9 Late 1988 Sub total (b) 64