Renewable energy projects which have received financial assistance from the department of energy during the period November 1987 to October 1988
Project title Contractor D'EN total spent '000 Spend November 1987 October 1988 '000
1. Biofuel projects
Experimental studies on catch fuel crops U. Reading 67.398 -0.350
BR5/2—Coppiced trees as energy crops Forestry Comm 112.607 7.303
BR5/3—Single stem trees as energy crops U. Aberdeen 203.593 29.627
C4/I Straw combustion trials FEC 1 83.714 11.884
IHTEG of forestry for energy with agriculture U. Reading 82.385 30.078
Assessment of basic landfill microbio PT II Food RI 30.310 14.470
C4/1—Support to straw combustion trials FEC 1 19.563 2.285
Coppice weed control LARS 27.673 10.453
BR5/4 Large scale trails of short rotation coppice U. Aberdeen 142.174 74.058
BR4/3 EOP trials—Harvesting processing + storing U. Aberdeen 232.300 126.810
C5/2—Wood combustion trials FEC 1 104.401 47.887
Model for refuse processing WSL 27.150 9.855
C5/2—Support to wood combustion trials FEC 1 3.897 3.897
National assessment of LF gas production—PH 1 ERL 185.871 121.530
C5/03 Monitoring of project 1557 (Fibroheat) OVE ARUP 65.685 30.277
Support services in forestry for energy U. Aberdeen 34.343 22.988
C4/6 Consultancy in farm wastes as fuel area Halcrow 30.177 6.758
Development of a mobile straw wafering machine AFRC 210.830 111.410
Development of a mobile straw wafering machine British sugar 99.316 99.316
Thermochemical conversion of wastes + Biomass U. Aston 8.863 4.288
RDF Combustion trials WSL 235.532 160.340
Peat as fuel SCAE 61.457 38.150
Fouling and corrosion studies WYPR 13.388 1.674
Cyclone combustor with integrated ash removal CPC 26.400 26.400
Modified chain grate stoker shell boiler Energy supplies 120.357 120.357
Waste processing and emissions monitoring WSL 3.388 3.388
Shredded waste derived fuel storage bunker trials Henley Burrowes 13.931 13.931
Hydrogeological assessment WRC 1.441 1.441
Review of market for industrial waste combustors PE Inbucon 41.085 28.774
Pre treated refuse WSL 25.716 25.716
RDF combustion programme consultancy services WYPR 15.493 11.143
RDF combustion WYPR 14.165 7.546
Methane recovery from anaerobic digestion MSW Coombs J. 3.875 3.875
Access agreement 2 on project 1668 Avery 0.721 0.721
Review of private waste disposal contracting Ind Aspinwall 13.450 13.450
2. Geothermal Energy Projects
Consultancy studies Hoare Lea 41.210 1.458
Marchwood Access Licence CEGB 3.600 1.200
Southampton District Heating Monitoring Utilicom 52.000 52.000
Geothermal project at Rosemanowes: Phase 2B CSM 9,081.000 -98.643
Seismic Monitoring in S.W. England: 1987–89 BGS Edingburgh 188.069 119.709
Cost Modelling of HDR Systems Poly Sunderland 79.829 54.526
Geothermal Project at Rosemanowes: Phase 2C CSM 5,866.000 3,325.000
Project Management Study at Rosemanowes Quarry Taylor Woodrow 57.684 5.235

discovery of a canister at Drigg, whose contents were contaminated with small amounts of plutonium. The main conclusions of the investigation are set out in a news release made today by the HSE, a copy of which is being placed in the Library of the House.

Dr. Thomas

To ask the Secretary of State for Energy if he will set out for each of the individual projects listed, pursuant to his reply to the hon. Member for Brentwood and Ongar, (Mr. McCrindle)Official Report, 4 November, columns 819-22 in the eight research categories (a) the financial assistance provided in the period November 1987 to October 1988 and (b) the total financial assistance provided from Government funds since the start for each project.

Mr. Michael Spicer

Renewable energy projects for which the Department provided financial assistance in the period November 1987 to October 1988 are listed together with the total spend by the Department on the projects to October 1988, and the spend during the period November 1987—October 1988.

Project title Contractor D'EN total spent '000 Spend November 1987 October 1988 '000
Development of Geothermal power plant TWVC KSES 84.027 16.018
Commercialisation Studies at Rosemanowes Quarry Taylor Woodrow 253.655 63.662
Consultancy Services for Prog Geoscience 32.965 22.367
Radon Gas Measurement in CSM Reservoir U. Bath 73.648 40.542
Hydro Thermal Alteration of Granite to 250 Celcius CSM 13.530 13.530
Infrastructure Study—Weardale plus Cumbria RTZ 15.623 15.623
Environmental Study at Weardale plus Cumbria Tecnitas 13.630 13.630
Geochemical Studies of HDR Reservoirs BGS Keyworth 116.541 116.541
3. Hydro Projects
Feasibility of Pneumatic Hydro-Electric Systems Hydro Energy 71.259 3.750
Performance plus Economics of Pneumatic Water Engine Poly Plymouth 46.729 11.270
Pneumatic Low Head Hydro Systems (Monitoring) Hydro Energy 50.677 11.475
Wells Turbine Pneumatic Power Conversion U. Belfast 31.777 11.710
Potential Resource in United Kingdom plus Northern Ireland SCEL 142.449 112.247
4. Solar Projects
Operating Agent for 1EA Task III U. Cardiff 161.286 37.546
Bebington Trombe Wall House Trial Pilkington 182.288 -0.087
Seri-Res Refinement Poly Cen London 150.691 0.721
Housing Layout Design Guide NBA Tectonics 25.100 20.000
Performance Analysis Service II CAP Scientific 658.421 123.935
Housing Design Guide AASA 102.496 47.443
Non Domestic Design Studies I OVE ARUP 153.060 22.260
Linford/Pennylands Book ECD Partnership 9.336 2.773
Field Trials Team 1 Phase II (Project 1169) Databuild 103.426 37.331
Field Trials Team 1 Phase III (Projects 1169 1371) Databuild 118.523 118.523
Test Cells 2 (EEC) U. Strathclyde 110.000 35.000
Tea Task XI Databuild 59.455 31.740
DAS Feasibility Study I PE Inbucon 76.636 .350
Cost Analysis Service II Davis Langdon 128.437 92.565
Performance Analysis Review I Part I U. Wist 13.465 6.887
Heat Transfer Coefficient Review Phase I Halcrow 26.376 13.677
Performance Analysis Review III Abacus 10.266 2.953
User Interface Development I Ecotec 15.064 11.051
Performance Analysis Review IV U. Newcastle 11.328 11.328
Test Cells 3 Energy Monitoring 3 65.966 37.417
Code Development II Haves P 2.088 1.225
Applicability Study 1 Poly Leicester 98.607 98.607
Teatask VIII Sub Task C BRE 139.502 57.712
UK/US Test Rooms Poly Cen London 7.699 7.699
Liaison with Institutions NBA Tectonics 16.650 16.650
Programme Consultancy 2 (AB) U. Newcastle 1.876 1.876
Fenestration 2000—Market Context Study Pilkington 12.075 12.075
Airium/Cons Review OVE ARUP 14.472 14.472
Non Domestic Building Design Studies 2 Halcrow 51.025 39.808
Field Trials Team 2 U. Wist 233.191 72.656
Criterion Values I U. Surrey 24.108 2.217
Non Domestic Design Studies Phase 2 (ATRIA) BDP 45.397 45.397
House Design Studies II (Midlands) Databuild 50.666 27.451
House Design Studies II (South) NBA Tectonics 11.980 7.550
Performance Analysis Service CAP Scientific 159.164 140.575
Performance Analysis Service Oscar Faber 25.305 25.305
Assistance to the Passive Solar Programme CAP Scientific 6.018 6.018
Airflow Modelling Review Project OVE ARUP 4.952 4.952
5. Wind Projects
Performance monitoring of Orkney HAWTS WEG 1665.867 21,362
Further studies of the vertical axis wind turbine McAlpine Robert 167.413 -.807
Construction of Carmarthen Bay 25m VAVGWTG VAWTL 1711.777 400.000
Performance monitoring of 25m VAVGWTG VAWTL 1304.096 263.029
Base consultancy to wind energy programme Atkins Consultants 261.914 31.543
Prediction of fatigue damage in wind turbines Taylor Woodrow 43.099 4.800
Finite element modelling of wind turbines Garrad Hassan 16.128 2.115
Near wake wind tunnel studies U. Loughborough 57.922 9.848
Monitoring equipment for 60m HAWTG LS-I PH II +III WEG 721.329 83.224
Consultancy to project 1361 Garrad Hassan 2.507 1.675
Fatigue evaluation of wood laminates U. Bath 190.376 25.741
Wind energy cost modelling Poly Sunderland 47.677 19.591
Syncrhronous/induction generator testing Taywood Eng. 78.862 33.696
Fatigue strength of weld details WEGL 65.880 65.880
Model survey of prototype 25m VGVAWTG VAWTL 50.497 9.507
Assessment of wind potential at WEC sites U. East Anglia 76.741 41.727
Analysis of flexible WTGS U. City 46.941 23.096
Design +dynamic analysis of flexible WTGS SERC .000 -12.000
Development of turbine for Richborough site CEGB 353.656 353.656

Project title Contractor D'EN total spent '000 Spend November 1987 October 1988 '000
Turbulence spectra for rotating VAWTG Garrad Hassan 15.046 1.646
Test of a WTG with stall regulated blades Taywood Eng. 214.426 73.705
Relocation of the 28m mast Orkney Taylor Woodrow 25.63 2.936
Prediction of community noise levels due to WT OP U. Southampton 30.498 12.991
Fatigue tests of wood blade/stud interfaces WEGL 72.170 20.230
Wind tunnel evaluation of thick aerofoil sections U. Reading 89.232 65.059
Design of support structure mech +elec systems VAWTL 55.441 6.614
Use of wood for large WTG rotors Composite 170.598 l7.799
Survey of control methods for VAWTS U. London QMC 21.085 14.190
Flow visualization in USA James Howden 2.630 .260
Wind measurement at West Sole BMT 128.984 93.240
Review of GRP WTG blades and design codes VAWTL 20.571 20.571
Outline design of LS-2 MW-scale HAWTG WEGL 301.910 110.669
Benchmark exercise on load prediction WEGL 15.974 4.879
Validation of unsteady flow study Cranfield 6.819 6.819
Effect of turbine rotation on max lift coefficient U. London Imperial 11.647 11.647
Stall control on WTGS U. London Imperial 21.693 21.693
Performance prediction for stalling HAWTGS Cranfield 47.075 47.075
Direct coupled generators for large WTGS IRD 23.850 18.233
Weight/cost projections for MW VAWTGS VAWTL 63.732 13.219
Parametric cost study of large hawtgs WEGL 40.948 7.647
Fatigue of welded joints in wtgs Welding Institute 19.272 19.272
Vawtg aerodynamics in the environment + W/tunnels VAWTL 92.016 64.328
Full scale flow visualisation of wtg U. Bristol 52.141 39.827
Long term fatigue measurements on MS-1 WEGL 54.997 9.977
Long term wind + performance data for MS-1 WEGL 18.76 15.228
Options for variable speed operation of hawtgs WEGL 43.491 32.480
Base consultancy continuation Atkins consultants 89.376 71.963
Sensitivity of design of Howden 1 MW wtg James Howden 42.203 10.818
Investigation of the onset of stall on WTG blades U. Southampton 9.990 9.990
Characterisation of wake turbulence Garrad Hassan 34.264 31.435
Detail design of 1.2 MW VAWTG VAWTL 402.550 353.790
Design of aerofoils specifically for VAWTGS U. Glasgow 6.283 6.283
Extension of adaptive control techniques WEGL 116.824 116.824
Noise + visuals characteristics of wtg in M. Keynes MKDC 10.031 10.031
60M WTG performance monitoring phase 4 WEGL 97.286 97.286
Design of aerofoil sections for hawtgs Garrad Hassan 41.013 36.985
Wind turbine control systems modelling + design U. Strathclyde 38.565 17.801
Design construction + demo of MS3 wtg WEGL 193.000 193.000
Study of an all wood composite rotor WEGL 62.750 62.750
Leading edge devices for control of HAWTGS British Aerospace 1 4.095 4.095
WT investigations of wake structure in wind farms Garrad Hassan 18.733 12.993
Environmental constraints on UK wind resource HERC (ITE) 36.817 36.817
Further development of finite element dynamic code Garrad Hassan 53.724 48.045
Future development for the Howden 750KW/1MW WTS James Howden 70.372 70.372
Control system simulation package WTS exec group Industrial S+C 21.498 21.498
6. Tidal Projects
Further consideration of caisson design Yard 38.650 3.860
Air turbines for the tidal barrages Yard 21.000 4.200
Hydraulic effects of a tidal barrage Mersey barrage 65.451 12.418
Mersey barrage feasibility study stage I Mersey barrage 184.457 111.222
Tidal barrage construction RPT 183.600 59.467
Consultancy in tidal power Binnie 26.780 11.443
Post-barrage densities of birds: wader study NERC (ITE) 81.775 51.863
Migratory fish—passage through low head turbines Solomon DJ 20.515 10.952
Wader migration BTO 38.229 31.243
Ecology of sub estuaries of the Severn U. Bristol 44.959 25.318
Post barrage densities of birds: invertebrates NERC (IMER) 60.812 60.812
Post barrage densities of birds: sediments Ravensrodd 31.986 26.470
Severn barrage preparation of work prog public con Balfour Beatty 82.967 8.297
Generic steel designs (SCI) SCI 78.042 78.042
Severn barrage development project STPG 1,020.286 782.760
Predicting marginal veg post barrage development NERC (ITE) 10.384 10.384
7. Wave Projects
Operation and maintenance of cadnam wave tank Wavepower 247.351 -4.000
Wave energy studies U. Edinburgh 366.872 15.000
Work on Wells turbine U. Belfast 55.949 3.295
Reactionless wave energy converter U. Lancaster 20.623 -0.701
Development of small scale sea clam Sea 311.344 1.428
Small scale low cost wave energy devices (phase I) U. Belfast 61.954 12.531
Wave tank facility U. Edinburgh U. Edinburgh 59.990 25.000
Small scale low cost wave power devices phase II U. Belfast 176.418 176.418
Further work on PS frog U. Lancaster 9.526 9.526

Project title Contractor D'EN total spent '000 Spend November 1987 October 1988 '000
8. General Studies Projects
Common costing methodology for renewables Yard 69.401 48.076
Res and energy efficiency in Cornwall Cornwall CC 53.608 53.608
Impact of EC N N Energy R and D U. Ulster 21.881 21.881
CCC energy study support (project 1595) Halcrow 14.050 13.360
Simple costing methodology for RE programme RPT 12.400 12.400
Watt committee renewable energy resource project Watt committee 16.000 8.000

Note: A few projects were subject to final pricing during the period November 1987 to October 1988 on completion of contract. In some cases this led to a credit which is shown as a negative amount on the above table.