HC Deb 06 December 1988 vol 143 cc103-4W
Mr. Cohen

To ask the Secretary of State for Energy what was the tonnage of fuel(a) loaded into and (b) withdrawn from, reactor 1 at Berkeley power station between 4 April and 17 July; and what was the average burn-up per tonne of irradiated fuel withdrawn at this time.

Mr. Michael Spicer

I have asked the chairman of the CEGB to write to the hon. Member with the information requested.