§ Dr. Glynasked the Secretary of State for Transport if he will state the latest five-day and seven-day average traffic flows on a 16 and 24-hour basis on each section of the M4 between west London and Reading.
24-hr 7-day 16-hr 7-day 24-hr 5-day 16-hr 5-day 1983 Jl-22 89,000 1 92,000 89,000 1981 J2–32 101,000 1 106,000 100,000 1985 J3–42 85,000 1 89,000 84,000 1986 J4–4A 44,000 1 44,000 42,000 1986 J4A-4B 88,000 1 93,000 88,000 J4B-5 1 1 1 1 1986 J5–6 99,000 1 1 1 1986 J6–7 99,000 1 1 1 1986 J7–8/9 96,000 1 1 1 May 1987 J7/8/9 98,000 90,000 106,000 99,000 1986 J8/9–10 73,000 1 1 1 1986 J10–11 71,000 1 1 1 May 1987 J10–11 75,000 70,000 80,000 76,000 1986 JU-12 70,000 1 1 1 Note: The above figures are annual averages except those shown for May 1987 which are continuous counts.
1 Not available.
2 Scaled to 1986.