§ Mr. John Carlisleasked the Secretary of State for Transport if he will take steps to ensure that, during the road maintenance works to be carried out around junction 8 of the M1 between 2 and 16 July, any work which might impede traffice flow on the A1 between Baldock and London is suspended for the same period.
§ Mrs. ChalkerThe contractor responsible for the A1(M) Roestock-Stanborough scheme at Hatfield has been instructed to keep two lanes open in each direction on the dual-carriageway section. There will be a change in junction layout at Roehyde on the single-carriageway section, but this is not expected to cause additional delays to traffic. There will be no other roadworks on Al between Baldock and London during this period.