§ Dr. Marekasked the Secretary of State for Foreign and Commonwealth Affairs what wind power electricity generation equipment has been installed on Tristan da Cunha; what is its capacity; and whether it is still in operation.
§ Mr. RentonA wind turbine generator designed to produce 45 kilowatts, supplied by Windmatic a/s of Denmark, was installed on Tristan da Cunha in 1982. In May 1983 it was blown down and damaged beyond repair.