HC Deb 08 December 1983 vol 50 c211W
Mr. Fry

asked the Secretary of State for Transport what has been the expenditure in real terms on (i)

£ million
1975–76 1976–77 1977–78 1978–79 1979–80 1980–81 1981–82
(a) Reconstruction
(i) Motorways 6.8 12.2 9.6 11.3 14.6 33.4 49.28
(ii) Trunk Roads 16.5 17.6 17.3 17.6 14.5 8.8 17.36
(iii) Local Roads N/A N/A 81.0 87.5 79.1 67.8 N/A
(b) Resurfacing
(i) Motorways 8.5 3.4 5.6 7.2 4.4 3.3 5.55
(ii) Trunk Roads 17.9 10.8 10.9 11.9 10.0 6.5 10.53
(iii) Local Roads N/A N/A 83.8 77.0 83.3 70.3 N/A
(c) Surface Dressing
(i) Motorways 0.2 1.6 0.4 0.4 0.2 0.2 0.78
(ii) Trunk Roads 1.3 1.3 0.4 1.4 1.0 1.0 1.43
(iii) Local Roads N/A N/A 47.0 49.3 56.5 56.3 N/A
(d) Patching
(i) Motorways 1.4 1.2 1.5 1.5 1.9 1.7 2.77
(ii) Trunk Roads 5.8 5.2 4.8 4.9 4.0 4.0 4.55
(ii) Local Roads N/A N/A 75.2 81.5 90.4 76.9 N/A
(e) All Carriageway Repairs
(i) Motorways 16.9 18.4 16.1 20.3 21.1 38.7 58.38
(ii) Trunk Roads 41.6 34.9 33.4 35.7 30.1 20.3 33.87
(ii) Local Roads 304.7 311.9 287.0 295.3 309.3 271.3 N/A