§ Mr. Dorrellasked the Secretary of State for Foreign and Commonwealth Affairs if he will list the projects which have received United Kingdom aid under the aid-trade provision, together with the amount of aid allocated to each project in the years 1979–80, 1980–81 and 1981–82.
§ Mr. Neil MartenAllocations of aid under the aid and trade provisions have been made to the following projects during 1979–80, 1980–81 and 1981–82:
397W
Country Project Allocation* £ million 1979–80 Burma Gas Turbines 3.201 Egypt Draglines/Irrigation equipment 2.606 Egypt Electricity Generation 10.202 Egypt Switchgear 2.005 Kenya Soda Ash Railway Wagons 1.279 Malaysia IOCOM Submarine Cable 9.019 Pakistan Ships 9.6 Philippines Rural Electrification 4.51 Senegal Aircraft 1.0 Tanzania Bus Chassis 0.481 1980–81 Burma Jute Carpet Backing plant 1.179 Burma Jute Mill 2.154 Burma Marine Diesel engines 1.202 Caribbean Development Bank Aircraft 2.596 Cyprus Power Station equipment 0.366 Madagascar Aircraft Maintenance equipment 0.6 Malaysia Airport study 0.45 Philippines Rural electricity survey 0.08 Philippines Wood-burning Power Stations 1.967 Sri Lanka Locomotives 2.905 1981–82 Bandladesh Combined Cycle Power Station 4.68 Colombia Pre-fabricated Bridges 0.3 Kenya Telecommunications equipment 0.705 Mexico Sicartsa Steel Mill 34.94 Morocco Nador Steel Rod Rolling Mill 13.505
Country Project Allocation* £ million Mozambique Bus Maintenance 1.0 Mozambique Mineral Inventory 1.03 Paraguay Power Transmission Scheme 2.87 Zimbabwe Railway Electrification 8.239 * Allocation figures refer to the total aid commitment for each project; and these amounts will often be disbursed over more than one financial year.