HC Deb 04 February 1981 vol 998 c155W
Mr. Rooker

asked the Secretary of State for Transport whether any further evidence of structural failure has been discovered on the elevated sections of Midland link motorways; and if he will make a statement.

Mr. Kenneth Clarke

The principal inspections of the elevated sections of the Midland link motorways are continuing and the following defects have been recently reported:

  1. a. cracking in the deck slab carrying a slip road at Gravelly Hill Interchange;
  2. b.deterioration of reinforced concrete crossbeams at Gravelly Hill.

Investigation of these defects is proceeding but there is no immediate risk to the structure.

Forward to