§ Mr. Fryasked the Minister of Transport of he will list in the Official Report
Scheme Pre-tender estimate £ million Accepted tender £ million A1 Felton By-Pass, Stage 2A … … 1.6 1.7 A2 Canterbury By-Pass … … 9.4 8.9 A6 Silsoe By-Pass … … 1.4 1.4 A13 Mar Dyke-East of Grays … … 16.7 18.4 A19 Billingham Diversion—Earthworks … … 3.9 1.9 A27 Portsbridge-Broadmarsh Improvement … … 2.3 2.0 A30 Billet Bridge-Avondale Road … … 0.6 0.6 A34 Whitchurch-Litchfleld Improvement … … 2.0 2.1 A45 Ipswich By-Pass (Orwell Bridge) … … 23.6 23.6 A47 Swaffham By-Pass … … 3.1 3.4 A56 Haslingden By-Pass … … 10.4 10.8 A65 Skipton By-Passes … … 10.5 10.2 A66 Stockton-Thornaby … … 12.3 10.4 A66 Appleby By-Pass … … 6.5 6.6 A590 Meathop-Sampool Bridge … … 7.4 6.0 A604 Bar Hill.Godmanchester … … 8.3 8.1 A1079 Beverley By-Pass … … 7.8 8.0 M25 Chertsey-Wisley: New Haw Viaduct … … 3.5 3.7 M25 A111-A10 … … 17.1 15.8 M25 Egham-Yeoveney … … 8.9 6.4 M63 Stockport East/West By-Pass, Stage 2 … … 7.7 6.1 M25 A13-A12, Stage 2 … … 8.1 7.2 Note: The pre-tender estimates listed above correspond in coverage to the tender; they exclude contingency allowances, land, and ancillary items included in estimates of total cost. The contracts covered are those for schemes in the national trunk road programme costing more than £0.5 million.
§ Mr. Fryasked the Minister of Transport what are the factors used to revalue 1978 survey prices to 1979 survey prices for trunk road construction, trunk road maintenance, local road construction and local road maintenance for each of the years of the period of the forthcoming public expenditure survey.
§ Mr. Kenneth ClarkeThe following factors have been used to revalue these programmes:
1978 survey prices to 1979 survey prices Motorway and trunk road construction: Roads output price index 1.092 Land cost index 1.296 Local Road Construction: Tender price index 1.165 Cost outturn index 1.089 Land cost index 1.296 Motorway and trunk road maintenance 1.089 Local Road Maintenance 1.112 Because the mix of expenditure between land, work in progress and new works, varies from year to year, the overall effect of the revaluation can differ as between one year and another even though the same underlying factors have been used.
778Whis Department's pre-tender estimates of the prices for each trunk road contract let so far in 1979, together with the actual price of the accepted tender.
§ Mr. Kenneth ClarkeThe information required is as follows: