§ Dr. Roger Thomasasked the Minister of Transport what percentage of the time during the past 12 months the two lanes over the Severn bridge have been totally open in both directions.
§ Mr. FowlerThe two lanes over the present Severn bridge have been totally open in both directions for 73 per cent. of the time during the past 12 months.