HC Deb 19 May 1978 vol 950 cc338-9W
Mr. John Moore

asked the Secretary of State for Scotland if he will give the latest available figures for electricity generating capacity in Scotland from coal-fired, oil-fired, nuclear and hydro-electric plant, respectively.

Mr. Gregor MacKenzie

At 1st April 1978, the total firm generating capacity available to the Scottish electricity boards, expressed in megawatts—sent out—was as follows:

Coal-fired 4,282
Oil-fired 2,052
Nuclear 1,496
Hydro-electric 1,866
Total 9,696

Mr. John Moore

asked the Secretary of State for Scotland if he will detail electricity generating plant in Scotland either under construction or for which investment decisions have been taken, or for which investment is planned.

Mr. Gregor MacKenzie

The following generating plant is at present under construction:

SSEB Inverkip (oil) (Third unit—642 MW)

NSHEB Peterhead (oil/gas) (1284 MW) Lerwick (oil) (4.4 MW) Flotta (gas turbine) (3.2 MW)

The boards have taken decisions to invest, subject to appropriate consents, in the following new plant:

SSEB Torness (nuclear) (1284 MW)

NSHEB Lerwick (oil) (14 MW) Sullom Voe (gas turbine) (10 MW) Tiree (oil) (0.4 MW)

In addition, NSHEB is giving preliminary consideration to the possibility of constructing a pumped storage scheme at Craigroyston on Loch Lomond.

Forward to