Mr. Edge
asked the Secretary of State for Energy if he will hold consultations with the British Gas Corporation with a view to requiring the Corporation to supply gas to households requiring it.
§
Dr. John Cunningham
No. Section 2(1) of the Gas Act 1972 properly requires the Corporation to satisfy reason
ELECTRICITY USED ON WORKS AT CEGB POWER STATIONS |
|
|
|
1972–73 |
1973–74 |
1974–75 |
1975–76 |
1976–77 |
Estimated value (£m.) |
… |
… |
56.1 |
64.3 |
102.7 |
123.5 |
145.8 |
Index of quantity |
… |
… |
100.0 |
97.6 |
100.8 |
95.3 |
100.6 |
It is not possible to estimate the amounts saved as a result of conservation measures, but the electricity industry has always striven to minimise its use of scarce resources. |
ENERGY CONSUMPTION, NCB COAL MINING OPERATIONS |
|
|
|
|
|
|
|
1974–75 |
1975–76 |
1976–77 |
Estimated value (£m.) |
… |
… |
… |
… |
… |
… |
61.1 |
79.5 |
92.2 |
Index of quantities |
… |
… |
… |
… |
… |
… |
100.0 |
94.8 |
90.5 |
Information prior to 1974–75 is not available on a comparable basis. The NCB estimates that conservation measures led to a saving of just under £2 million in both 1975–76 and 1976–77. |
ENERGY CONSUMPTION, PUBLIC SUPPLY GAS SYSTEM |
|
|
|
1972–73 |
1973–74 |
1974–75 |
1975–76 |
1976–77 |
Estimated value (£m.) |
… |
… |
9.4 |
9.7 |
10.9 |
14.6 |
17.4 |
Index of quantities |
… |
… |
100.0 |
107.9 |
102.0 |
95.9 |
99.4 |
The BGC estimates that during the two years 1975–76 and 1976–77 conservation has led to a saving of just over £2 million in total. |