HC Deb 16 November 1977 vol 939 c256W
Sir A. Meyer

asked the Secretary of State for Transport what is the average cost of cattle and pedestrian bridges over dual carriageway roads.

Mr. Horam

The average costs are not readily available but the estimated cost of a typical cattle bridge, provided as an accommodation bridge, is £0.08 million. The estimated cost of a typical pedestrian bridge is £0.05 million. Both costs are at current prices. The costs can vary widely depending on the location, soil conditions, etc.