HC Deb 02 February 1977 vol 925 cc177-8W
Mr. Fitch

asked the Secretary of State for Transport if he will provide a list of all major road schemes with estimated starting dates at present in the preparation pool.

Mr. Horam,

pursuant to his reply [Official Report, 1st February 1977; Vol. 924, c. 106–18], circulated the following amendments and additions:

Amendments and Estimated start

  • A45 Levington—A1093 (c)*
  • A45 Ipswich bypass (c)*
  • A45 Grade separation at Leamington turn (c)*
  • A47 Wisbech bypass (c)* Kirkhamgate—Dishforth Stage 5 (e)*

Additions:

  • A12 Cambridge Park, Redbridge (b)
  • A1079 Market Weighton—York (f)*
FOOTNOTE. The possible start date of schemes depends on many factors including engineering design, statutory procedures, and availability of resources. Any start dates given must, therefore, be taken as subject to change. They will be advanced wherever circumstances permit.

They are quoted in bands:

  1. (a) 1977
  2. (b) 1978 and 1979
  3. (c) 1980–1982
  4. (d) 1983–1985
  5. (e) After 1985
  6. (f) No start date determined.

The schemes on roads included in the 4,500-mile strategic network are marked*.