HC Deb 18 November 1974 vol 881 cc341-2W
Sir Raymond Gower

asked the Secretary of State for Wales (1) if he will list, giving the mileage in respect of each, those local authority motorways or lengths of motorways in use, under construction, motorway schemes confirmed by the Secretary of State and those made by the local authority and submitted to the Secretary of State for confirmation, respectively, as at 30th September 1974;

(2) if he will list, giving the mileage in respect of each, those trunk motorways or lengths of motorway in preparation, firmly programmed, under construction and those motorways or lengths of motorways in use respectively as at September 1974.

Mr. John Morris

The information is as follows:

Motorways in preparation Mileage
Castleton to Coryton 8.0
Motorways firmly programmed
Tredegar Park to St. Mellons 4.7
Coryton to east of Miskin 5.2
East of Miskin to Pencoed 7.0
Bridgend northern bypass 8.1
Pyle Bypass 5.6
30.6
Motorways under construction
Pontardulais Bypass 8.4
Motorways in use
Newhouse to Tredegar Park 18.6
Port Talbot Bypass 4.4
Morriston Bypass 4.0
27.0

There are no local authority motorway schemes in use, under construction, confirmed or awaiting confirmation in Wales.