§ Mr. Stanleyasked the Secretary of State for the Environment what estimates of traffic flow, of the proportion of heavy vehicles, and of traffic speed, in accordance with paragraphs 2 and 3 of Schedule I of the Noise Insulation Regulations 1973, were used in determining entitlement to noise insulation for houses along the M20 (Ditton Bypass).
§ Mr. CarmichaelThe estimates were
- a. at the western end, Nepicar to A228: 65,560 vehicles a day in 1986 with 7.313 per cent, heavy vehicles;
- b. at the eastern end, A228 to Coldharbour: 73,042 vehicles a day in 1986 with 7.397 per cent, heavy vehicles;
- c. speed: 108 km/hr.
§ Mr. Stanleyasked the Secretary of State for the Environment whether the prediction method or the measurement method, as set out in Schedule I of the Noise Insulation Regulations 1973, was used in determining entitlement to noise insulation for houses along the M20 (Ditton Bypass).
§ Mr. CarmichaelGenerally the prediction method. Where this method was impracticable the measurement method was used.