§ Mr. Brewisasked the Secretary of State for Scotland if he will list, giving the mileage in respect of each, those trunk motorways or length of motorway in preparation, firmly programmed, under construction, and those motorways or length of motorway in use, respectively, as at 30th April.
§ Mr. Gordon Campbell:The information as at 30th April is given below:
129W
Under construction miles M9 … … EDINBURGH-STIRLING (a) Lathallan-Burghmuir … … … … … 5.04 (b) Burghmuir-Muriehall … … … … … 4.95 (c) Stirling Bypass (Craigfbrth-Torbrex) … … … 2.51 (d) Stirling Bypass (Torbrex-Pirnhall and Auchenbowie) 3.55 M80 … … GLASGOW-STIRLING (a) Haggs-Bankhead … … … … … … 0.96 (b) Ingliston-Pirnhall … … … … … 2.97 19.98 Firmly programmed M8 … … EDINBURGH-GLASGOW Baillieston-Glasgow City Boundary … … … 0.5 M8 GLASGOW-GREENOCK Bishopton Bypass Stage II … … … … … 3.82 M9 and M876 … EDINBURGH-STIRLING AND DENNYLOANHEAD-KINCARDINE BRIDGE (a) Polmont and Falkirk Bypass-Stirling Bypass (M9) and Bellsdyke Road Bypass (M876) … … … 10.00 (b) Bank head-North Broomage (M876) … … … 3.81 M80 … … GLASGOW-STIRLING Bankhead-Ingliston … … … … … … 2.61 M90 … … IN VERKEITHING-PERTH (a) Arlary-Muirmont … … … … … 9.2 (b) Muirmont-Craigend … … … … … 2.3 M90/M85 … PERTH BYPASS (a) Craigend-Broxden … … … … … 3.0 (b) Craigend-Barnhill … … … … … 1.5 36.74 In preparation M8 … … EDINBURGH-GLASGOW Newhouse-Baillieston … … … … … 5.5
§ Mr. Brewisasked the Secretary of State for Scotland if he will list, showing the mileage in respect of each, those local authority motorways or lengths of motorway in use, under construction, motorways schemes confirmed by the Secretary of State, and those made by the local authority and submitted to the Secretary of State for confirmation, as at 30th April.
§ Mr. Gordon Campbell:The information as at 30th April is given in the table below:
In use Miles Glasgow Inner Ring; Road: North and West Flanks Townhead Interchange 1.0 Kingston Bridge section 0.8 Woodside section 0.7 Charing Cross section 0.6 Total in use 3.1 Under construction None Schemes confirmed by the Secretary of Slate Glasgow Monkland Motorway (Stage I) 1.9 Schemes made and submitted to the Secretary of State for confirmation Edinburgh Easter Link Road 0.9 Renfrew Motorway (Stage I) 1.89 Total submitted for confirmation 2.79