HC Deb 21 March 1972 vol 833 c311W
Mr. Harold Walker

asked the Secretary of State for the Environment (1) what is the length of the Wadworth to Hatfield section of the M18 motorway;

(2) what alterations are proposed to be made to the A638 road bridge over the railway at Cantley, Doncaster, consequent upon the making of the M18 motorway through Doncaster;

(3) how many houses in the Borough of Doncaster will be affected by the making of the Wadworth-Hatfield section of the Ml8 motorway.

Mr. Michael Heseltine

My right hon. Friend's decision on the route of this section of the M18 will be announced very shortly and it would be inappropriate to give this information before then.