HC Deb 21 December 1972 vol 848 cc429-30W
Mr. Brewis

asked the Secretary of State for Scotland whether, in improving A9 on those sections which do not require dual-carriageways immediately, he will include the necessary earthworks for a second carriageway in view of the small extra cost compared with the substantially greater expenditure if carried out at a later stage.

Mr. Gordon Campbell

The urgent task is to reconstruct A9 between Perth and Inverness on a new line where it now follows a winding route with poor visibility. This will give traffic the improved road it needs in the shortest possible time. The design of the new road will be such as to permit the provision of dual carriageway later as required. It would not be advisable to incur the substantial additional cost of earthworks at this stage at the expense of deferring other urgent schemes in the Scottish road programme.

Physical Education Home Economics Technical Subjects Music Drama Art
M W M W M W M W M W M W
Glasgow 0.2 3.7 4.1 0.8 2.6
Edinburgh 1.0 1.5 1.5 0.1 0.5 1.0
Dundee 0.2 0.4 0.8 0.5 1.0
Aberdeen Burgh 0.5 0.4 0.4 0.2 0.1 0.4

Mr. Lambie

asked the Secretary of State for Scotland how many fully registered teachers, showing men and women separately, and excluding head teachers, employed on a permanent basis in the secondary departments of special schools administered by the Glasgow, Edinburgh, Dundee and Aberdeen Education Authorities, respectively, have a main qualifica-

Some dual carriageway sections are of course being included in the reconstruction of A9 now.