§ Mr. Denzil Daviesasked the Secretary of State for Wales what schemes are being proposed, or are the subject of feasibility studies, for the widening to dual-carriageway structure of the A48 road between Port Abraham and Cross Hands.
§ Mr. Peter ThomasA scheme for a dual carriageway by-pass of Cross Hands and Drefach is in the Preparation Pool. The length of the road between Port Abraham and Cross Hands is the subject of a Feasibility Study. It will not be possible to decide how the conversion of 457W the road to dual-carriageway standard will be carried out until the results of the Feasibility Study have been received and considered.