§ Mr. Redmondasked the Secretary of State for the Environment if he will list those public inquiries in respect of road schemes costing more than £1 million in respect of which he has not yet announced his decision, giving the date each public inquiry was held.
§ Mr. Michael HeseltineThe list is as follows:
Road Scheme and Date of Inquiry
- 1. London-Dover Radial—September, 1970.
- 2. A590 Barrow (Arnside) Link—November/December, 1970.
- 3. A3 Esher Bypass—November/December, 1970*.
- 4. M18 Wadworth-Hatfield—March, 1971.
- 5. M3 Popham-Compton—March, 1971.
- 6. All Cringleford Bypass—May, 1971.
- 7. M25 Chertsey-Leatherhead—June, 1971.
- 8. A259 Realignment in Shoreham and Southwick—June, 1971.
- 9. M27 Cadnam-Chilworth—July, 1971.
- 10. M5 Cullompton-Poltimore Bowls—July 1971.
- 11. A50 Blyth Bridge Bypass—July, 1971.
- 12. Birmingham-Coventry Road—August, 1971*.
- 13. M62 Rawcliffe-Balkholme—August, 1971.
- 14. Portsmouth-North/South Road Stage 2 (Church Street to Kingston Crescent)—September, 1971*.
- 15. A406 Colney Hatch Lane Flyover—September, 1971.
- 16. Coventry-Stiviehall-Chcylesmore Bypass October, 1971.
- 17. A61 Barnsley-Eastern Relief Road—November, 1971*.
- 18. M62 Ferrybridge-Rawcliffe—November, 1971
- 19. M18 Thorne-East Cowick—November, 1971.
- 20. M5 Almondsbury Junction—Southmead, November, 1971.
- 21. A14 Huntingdon-Godmanchester Bypass—November, 1971*.
- 22. A567 Litherland Lift Bridge—November, 1971*.
These cases give rise to issues of varying complexity and decisions will be given as soon as possible. In the case of the London Dover Radial a decision must be deferred at any rate until the Greater London Development Plan local inquiry in January, 1972.
* Compulsory Purchase Order only.