HC Deb 06 November 1970 vol 805 cc468-9W
Mr. Redmond

asked the Secretary of State for the Environment if he will list, showing the mileage in respect of each, those local authority motorways or lengths of motorway in use, under construction, motorways schemes confirmed by the Minister, and those made by the local authority and submitted to the Minister for confirmation, respectively.

Mr. Michael Heseltine

Following is the information:

Under Construction Miles
Leeds Inner Ring Road Stages II and III 1.9
A38 (M) Aston Expressway 1.6
M602 Eccles By-pass 1.8
Ringway Airport Link 0.4
M606 Bradford South Radial Motorway 2.3
M57 Liverpool Outer Ring Road Stage I 3.3
A627 (M) Broadway Extension 4.2
M68 Middleton Link 1.2
East Cross Route Stage I 0.9
17.6

LOCAL AUTHORITY MOTORWAYS
Schemes Confirmed by the Minister Miles
Leeds South East Urban Motorway Stage I 2.5
Newcastle-upon-Tyne Central Motorway East 1.2
Leeds Inner Ring Road Stage IIA 0.4
East Cross Route Stage II 0.6
Leeds Inner Ring Road Stage III 0.7
Portsmouth City Council (M27—Twyford Avenue Section) Motorway Scheme 1.6
7.0

Schemes made by the Local Authority and submitted to the Minister for confirmation Miles
Ellesmere Port Motorway 5.2
Mancunian Way 1.4
A329 Relief Road (Numbers 1 and 2) (Berkshire Section) 5.4
A329 Relief Road (Reading Section) 0.7
Bristol Parkway Stage II 0.9
Liverpool Outer Ring Road (Kirkby—Tarbock) 7.5
Dover Radial Route 3.3
24.4