§ Mr. Emeryasked the Minister of Power if he will list the sites of nuclear power stations now built or proposed together with details on the fuel used, and the estimated unit cost of electricity now based on a 25-year life of the plant.
§ Mr. FreesonExisting C.E.G.B. Power Stations
- Berkeley.
- Bradwell.
- Dungeness "A".
- Hinkley Point "A".
- Oldbury-on-Severn.
- Sizewell.
- Trawsfynydd.
Stations under Construction
- Dungeness "B" (0.56d.).
- Hartlepool (0.52d.).
- Hinkley Point "B" (0.52d.).
- Wylfa.
The figures in brackets are the estimated base-load generating costs of A.G.R. stations using enriched uranium, based on a 25-year life and 8 per cent. interest, and assuming a 75 per cent. load factor. The C.E.G.B.'s decision to adopt
Production of Coke Domestic Disposals of Coke England Wales Scotland Total* England Wales Scotland Totals* (million tons) (million tons) 1954 … 25.0 3.1 2.0 30.1 3.14 0.03 0.11 3.28 1955 … 25.5 3.3 2.0 30.8 3.37 0.03 0.11 3.51 1956 … 26.2 4.0 2.0 32.2 3.18 0.03 0.10 3.31 1957 … 26.4 4.1 2.0 32.5 2.87 0.02 0.08 2.97 1958 … 24.0 3.9 1.7 29.6 2.92 0.02 0.09 3.03 1959 … 21.7 3.9 1.4 27.0 2.84 0.02 0.09 2.95 1960 … 22.4 4.5 1.7 28.6 3.33 0.02 0.11 3.46 1961 … 21.8 4.2 1.6 27.6 3.42 0.02 0.09 3.53 1962 … 19.9 4.2 1.2 25.3 3.92 0.02 0.10 4.04 1963 … 19.5 4.5 1.2 25.2 4.24 0.02 0.10 4.36 1964 … 19.4 4.8 1.5 25.7 4.17 0.03 0.09 4.29 1965 … 18.7 4.6 1.5 24.8 4.30 0.03 0.10 4.43 1966 … 17.3 4.8 1.2 23.3 4.21 0.05 0.09 4.35 1967 … 15.9 4.6 1.0 21.5 4.09 0.02 0.07 4.18 1968† … 14.8 4.8 1.2 20.8 3.71 0.04 0.07 3.82 * The figures relate to Great Britain only. *† Provisional.