§ Mr. Kershawasked the Minister of Transport (1) what is the present position with regard to the Bamfurlong-East-ington section of the M5 which it was officially announced in January last would start during 1968;
(2) what is the present position with regard to the Eastington-Falfield-Almondsbury section of the M5 which it was officially announced in January last would start during 1968.
§ Mr. MarshDesign difficulties and objections to side road proposals have taken longer to resolve than anticipated. These schemes should be ready to start in early 1969.