§ Mr. George Jegerasked the Minister of Transport whether she has studied the two types of new speedy-construction bridges being produced by the Armoured Fighting Vehicle Experimental Establishment; and whether she will consider one of these for replacing the one-way swing bridge over the canal at Thorne.
§ Mr. CarmichaelWe have studied these two types of expensive special purpose bridges. These are not expected to become available until late 1968 and offer no advantages for this particular site over the temporary bridge we are currently examining.