§ Mr. Christopher Priceasked the Minister of Transport what measures she is taking to alleviate traffic hazards and delays during the forthcoming reconstruction of the M45 motorway.
§ Mr. SwinglerThe working methods adopted are designed to minimise the period of interference with traffic.
The diversions at each end of the closed carriageway will be carefully signposted. Motorway traffic will be completely separated from the road works and construction traffic: two-way traffic on the carriageway in use will be kept in separate lanes by special flexible bollards.