§ Mr. William Priceasked the Minister of Transport (1) when she expects repair work on the M45 to be completed;
(2) why the surface of the north-bound carriageway of the M45 is being torn up.
§ Mr. SwinglerDetails of the present roadworks on M45 were announced in the Press in mid-February. A copy of the Ministry's statement dated 13th February is still available in the Library. These works form part of the programme of comprehensive improvement and
PUNCTUALITY OF PASSENGER TRAINS 1960 1961 1962 1963 1964 1965 1966 Express Percentage of trains arriving right time 47 60 63 57 62 62 60 Percentage of trains arriving within 5 minutes of time 71 79 80 75 80 78 78 Other than Express Percentage of trains arriving right time 74 81 80 79 81 80 81 Percentage of trains arriving within 5 minutes of time 91 94 93 92 94 93 93
§ Mr. Mikardoasked the Minister of Transport whether she will give for the last year for which information is available the proportion of British Railways
136Wrepair to the original M1 and its spur roads, begun in 1962.
Reconstruction of M45 is expected to be complete by about the end of September.