§ 44. Mr. Dalyellasked the Minister of Power what is the share of the cost borne by the Atomic Energy Authority as a result of the decision to modify the basic advanced gas-cooled reactor fuel element, from the 7 inch design at Dungeness B, in favour of a 7½ inch design at Hinckley B; and how much this amounts to in £ sterling.
§ Mr. FreesonI would refer my hon. Friend to the Answer I gave him on 10th April.—[Vol. 744, c.142.]