HC Deb 03 May 1966 vol 727 cc98-9W
Mr. Ian Lloyd

asked the Minister of Technology if he will enumerate the staff which have so far been engaged to work at the National Computing Centre at Manchester.

Mr. Cousins

The Director has been designated. He is currently examining the large number of applications received in response to a recent advertisement for staff.

Date of contract Contractor Project Value £ Date of completion
1. 19.11.65 Vickers Ltd. Design study of hydrostatic extrusion equipment. 7,000 Within 4 months
2. 23.11.65 University of Birmingham Development of Petro-forge high energy rate forming machine. 162,000 Within 18 months
3. 23.11.65 Drop Forging Research Association. Testing of die wear in connection with petro-forge development. 30,000 Within 18 months
4. 10.2.66 Ferranti Ltd. Development of a 2½-axis numerical control programme. 32,000 Within 15 months
5. 25.3.66 Sogenique (Service) Ltd. Design study of a numerically controlled measuring machine. 5,000 Within 9 months