HC Deb 29 June 1966 vol 730 c285W
65. Mr. Henig

asked the Minister of Transport why abnormal loads are being directed through the centre of Lancaster rather than along the M6 motorway; what is the definition of an abnormal load for this purpose; and for how long the diversion is likely to continue.

Mr. Swingler

The diversion is necessary to maintain a reasonable flow of traffic on the Lancaster by-pass motorway while the third lanes are being built. The loads in question are those over nine feet six inches wide, or fifty feet long or seventy-five tons. The diversion is likely to continue until December, 1966.

Forward to