HC Deb 08 February 1966 vol 724 c45W
Captain Kerby

asked the Minister of Transport if she will take steps to investigate the necessity of erecting a Bailey walk-way attached to Shoreham Toll Bridge; if she is aware that a walk-way for pedestrians would increase safety even after the bridge itself returns to partial traffic use in mid-March; and if she will give an estimate of the cost of a walkway and the time needed to erect it.

Mr. Swingler

We are advised that a suitable walk-way would probably cost more than £30,000 and take at least 12 weeks to construct. We do not consider that the use likely to be made of it would justify its provision.