§ Mr. W. T. Rodgersasked the President of the Board of Trade what was the total floor area of new buildings for the manufacturing industry completed in the London and south-eastern region and the northern region, respectively, in each of the periods 1945–49 inclusive, 1950–54 inclusive, 1955–59 inclusive, and since 1960.
§ Mr. ErrollThe figures are as follows:
New factories and extensions, for manufacturing INDUSTRY, GIVEN LOCATION APPROVAL FROM 1ST JANUAKY, 1945 Area: thousand sq. ft. Period Completed in Period London and South Eastern Region Northern Region 1945–1949 3,031 11,262 1950–1954 19,559 13,436 1955–1959 36,884 15,164 1960–30th September, 1962* 17,663 8,903 * Information on schemes completed after 30th September, 1962 is not yet fully available.
§ Mr. W. T. Rodgersasked the President of the Board of Trade what was the total floor area of new buildings for manufacturing industry authorised in the London and south-eastern region and the northern region, respectively, in each of the periods 1945–49 inclusive, 1950–54 inclusive, 1955–59 inclusive, and since 1960.
71W
§ Mr. ErrollThe figures are as follows:
New factories and extensions, for manufacturing INDUSTRY, GIVEN LOCATION APPROVAL from 1st January, 1945 to 31st May, 1963 Area: thousand sq. ft. Period Approved in Period London and South Eastern Region Northern Region 1945–1949 19,105 21,924 1950–1954 38,401 13,824 1955–1959 61,189 19,118 1960–31st May, 1963 24,781 12,809 Notes: 1 Schemes for replacement of buildings destroyed by fire or enemy action are excluded prior to July, 1948. 2 Industrial building approved from 1st January, 1959, follows the definition of manufacturing laid down in the revised"Standard Industrial. Classification, 1958".