§ Sir T. Mooreasked the Minister of Transport what schemes under the road programme costing over £100,000 were started in the six months ended 30th June, 1962; and what are the estimated completion dates and total cost of each.
§ Mr. MarplesThese schemes are:
63W
Estimated Completion Date Estimated Total Cost (including land) £ A.41—Albrighton By-pass, Salop Summer. 1963 … 294,000 A.55—Colwyn Bay boundary to Pencoed Quarry Section, Denbighshire Summer, 1963 … 291,000 A.60/A.601—Nottingham Ring Road Spring, 1964 … 1,369,000 A.74—Mossband new road bridge and approaches, Cumberland Early 1964 … 1,107,000 A.449—Penkridge to Dunston: Part I: The Cottage. Dunston to north of Bull Bridge Spring, 1963 … 164,000 A.465—Heads of the Valleys reconstruction: Part II: Hirwaun to Dowlais Top Late 1964 … 3,444,000 A.4123—Coseley to Tipton, Staffs Late 1962 … 312,000 Classified Roads London Area A.40—High Holborn (Holborn Place—Chancery Lane) (L.C.C.) Autumn, 1962 … 205,800 A.106—Temple Mills Bridge (L.C.C.) Early 1964 … 407,613 Widening between Lower Marsh and Morley Street, Waterloo Road (L.C.C.) Early 1963 … 136,056 Classified Roads Other Urban Areas B.274—Widening of Wellesley Road/Park Lane (Croydon C.B.C.) Spring, 1964 … 826,500 B.283—Worcester Park Railway Bridge (Maiden and Coombe B.C.) Spring, 1963 … 174,751 Inner By-pass (Canterbury C.B.C.) Summer, 1963 … 694,973 B.4034—Railway Bridge, Bletchley (Bucks C.C.) Spring, 1963 … 330,838 A.332—Stoke Road, Slough (Roadworks) (Slough B.C.) Spring, 1963 … 148,099 Plymouth Western Approach: Cambridge Street-Cobourg Street New Road (Plymouth C.B.C.) Late 1962 … 101,201 A.38—Bedminster Bridge (Bristol C.B.C.) Spring, 1964 … 484,600 A.519—Widening Clayton Road (Newcastle-under-Lyme B.C.) Spring, 1963 … 116,320 A.47—New Road and construction of dual carriageways: The Parkway (Birmingham C.B.C.) Autumn, 1963 … 805,675 New Industrial Road, Newport: Part III (Newport C.B.C.) Autumn, 1963 … 287,261 A.644 and A.563—Construction of section of Ring Road: A1dams Road to Wakefield Road (Dewsbury C.B.C.) Autumn, 1963 … 152,980 A.11— Widening of St. Stephens Street (Norwich C.B.C.) Late 1962 … 817,390 A.491—Bromsgrove-Stourbridge Road: Section 3: Fairfield Junction-Lydiate Ash (Worcs. C.C.) Autumn, 1963 … 202,514 A.4067—Diversion at Godrergraig (Glamorgan C.C) Spring, 1964 … 307,624 A.594—Construction of Portinscale By-pass (Cumberland C.C.) Summer 1963 … 208,770 B.5206 and B.5239-—Diversion of Shevington Lane (Lanes. C.C.) Summer, 1963 … 104,000 A.625—Whaley Bridge-Sheffield: Widening at Bamford (Derbyshire C.C.) Summer, 1963 … 101,204 Road 12: Hemel Hempstead (Herts C.C.) Summer, 1963 … 114,059 *Excludes land cost. This is included in the main scheme.