HC Deb 21 June 1961 vol 642 c135W
15. Mr. Redhead

asked the Minister of Transport whether he will give the latest estimate of the capital cost of constructing the proposed Victoria line.

Mr. Marples

Fifty-five million pounds. If, however, the interest on this sum was capitalised for the period of construction, the full capital cost at current rates of interest would be about £64 million.

Back to