HC Deb 20 July 1960 vol 627 c44W
53. Mr. Janner

asked the Minister of Transport what provision has been made in connection with the proposed viaduct over the Great West Road for an increase over the present traffic produced by new traffic generated by the viaduct, increase in traffic generally, increase in traffic to London Airport, and diversion of traffic from A.40 when the South Wales radial motorway is eventually completed to form a new route to South Wales.

Mr. Hay

The combined traffic capacity of the proposed viaduct and of the Great West Road will be about 2½ times that of the actual traffic in 1958. All the factors mentioned by the hon. Member have been taken into account.