HC Deb 17 April 1951 vol 486 c158W
97. Sir W. Wakefield

asked the Minister of Transport what is the estimated cost of altering the tramway tracks, including the laying of new tracks, undertaken in connection with the South Bank site of the Festival of Britain.

Mr. Barnes

The cost of alterations to the tram tracks at the junction of Westminster Bridge Road and York Road, including the laying of some new track, is estimated at £65,000.