HC Deb 05 May 1947 vol 437 c5W
67. Mr. Hobson

asked the Minister of Transport the number of boilers converted to oil fuel at Neasden L.P.T.B. Power Station; and the time taken for conversion and cost.

Mr. Barnes

The scheme for the conversion to oil fuel covers six boilers at Neasden Power Station, one of which was brought into operation in January last. The remaining five will be converted during the next 12 months as supply of the necessary materials allows. The total cost is estimated to be £45,000.