HC Deb 16 July 1946 vol 425 c170W
Mr. Marples

asked the Minister of Works what alterations are necessary to adapt the foundation of a Uni-Seco house for use with an Arcon house; what is the cost of altering one foundation; and how many man hours are spent on such alterations.

Mr. Tomlinson

To adapt the foundation of a Uni-Seco house for use with an Arcon house it is necessary to alter the position of entry of a branch soil drain and of the electric cable and to extend the channel to a gully. The cost of alteration is about £12 10s. and the labour required represents about 70 man-hours.