HC Deb 08 July 1946 vol 425 cc1-2W
26. Colonel Stoddart-Scott

asked the Minister of Transport what amendments have been made to the original temporary safety plans for Otley Bridge; when will the amended scheme commence; how much will the scheme cost; and why there has been eight months delay in the carrying out of these safety plans.

Mr. Barnes

The original plan has been amended to provide for control of vehicles entering and leaving the quarry near the bridge, and the estimated cost of the amended scheme is £2,500. Special control apparatus has to he made for the purpose, and the date when the installation will be put into operation depends on when that will be ready. I regret the delay that has occurred, but it has proved difficult to devise a satisfactory system of control. Consideration has been given to three different schemes for the purpose, and I am informed that the one now approved is the best that can be devised.