HC Deb 11 February 1932 vol 261 cc1037-8W
Mr. DORAN

asked the Minister of Transport the conditions laid down by the Ministry for the laying of the various types of road-surfacing on the Kingston by-pass road; and to what extent those contractors who were ready to supply new material were given facilities?

Mr. PYBUS

The test lengths on the Kingston by-pass were laid down in collaboration and under conditions agreed with the associations representing manufacturers of tar and bituminous materials. It was impracticable to deal direct with individual contractors, and in. consultation with the association a selection was made of what were considered to be the most representative materials in the various groups selected for test.