§ Mr. WhittingdaleTo ask the Secretary of State for Transport how much clay will be produced as a result of excavations to build the new Channel Tunnel link station at Stratford; and how it is proposed to dispose of it. [175030]
§ Mr. McNultyAbout 270,000 cubic metres of clay have been excavated to form the station box at Stratford. The clay was deposited on the Stratford Lands, where the surface is being raised by about 6 m for the redevelopment of the lands.