§ Mr. Gerald HowarthTo ask the Secretary of State for Defence (1) what the date of contract signature for the(a) Typhoon Aircrew Synthetic Training Aids, (b) Future Joint Combat Aircraft, (c) Short Term Strategic Airlift, (d) Sonar 2087, (e) Successor Identification Friend or Foe, (f) Trojan and Titan, (g) Type 45 Destroyer and (h) Skynet 5 projects are; [170555]
(2) what the date of contract signature for the (a) Spearfish Heavyweight Torpedo, (b) Sting Ray Lightweight Torpedo, (c) Swiftsure and Trafalgar Class Submarine Update, (d) Tornado GR1 Mid-Life Update, (e) Challenger II, (f) A400M (g) Landing Ship Dock (Auxiliary) and (h) Beyond Visual Range Air-to-Air Missile projects are; [170556]
(3) what the date of contract signature for the (a) Hercules C-130J, (b) High Velocity Missile System, (c) Landing Platform Dock (Replacement), (d) Merlin HC Mk 3 Helicopter, (e) Merlin HM Mk 1 Helicopter, (f) Multi-Role Armoured Vehicle, (g) Nimrod Maritime Reconnaissance and Attack Mk 4 and (h) Seawolf Mid-Life Update projects are; [170557]
(4) what the date of contract signature for the (a) Advanced Air-Launched Anti-Armour Weapon, (b) Advanced Short Range Air-to-Air Missile, (c) Airborne Stand-Off Radar, (d) Astute Class Submarine, (e) Attack Helicopter WAH-64 Apache, (f) Conventionally Armed Stand-Off Missile, (g) Typhoon and (h) Extended Range Ordnance/Modular Charge System projects are. [170558]
§ Mr. IngramI will write to the hon. Member and place a copy of my reply in the Library of the House.