§ Mr. CoxTo ask the Secretary of State for Transport what the average cost is of the provision is of a mile of a cycle lane. [65051]
§ Mr. JamiesonAverage costs are not available, but since cycle lanes use the existing carriageway of a road and are identified by markings and signs, costs are not high. The limitation in providing more cycle lanes on the carriageway will often be lack of sufficient road space to accommodate them.
Contractor Research (i) Hatfield Trimac Ltd. Specialist Photographic Support AEA Technology Rail Assistance with investigation including on-site derailment investigation, track profile measurements and examination of vehicles. AEA Consultancy Advice on non-destructive testing. Serco Rail-test Practical non-destructive testing of rails. Sheffield Testing Labs Chemical analysis of steel samples. Machine and tensile test of rails. (ii) Ladbroke Grove Grant Fire Consultants Review of existing fire standards and a review of the literature in respect of the behaviour of fires on porous ground. Interek Testing Testing of gas/oil samples. Forensic Science Services Paint analysis. Astra Zeneca Auto ignition temperature test of samples of gas/oil. University of Sheffield ICP analysis. Garvic Development Design advice related to fuel tank impact test. IC Consultants Technical support in respect of the failure of fuel tanks and of the collision dynamics. (iii) Potters Bar AEA Technology Rail Assistance with investigations. This information relates to the principal contractors only. A complete list of all the contractors involved could be provided only at disproportionate cost.