HC Deb 30 April 2002 vol 384 c678W
Mr. Greg Knight

To ask the Secretary of State for Transport, Local Government and the Regions for what reasons the carriageway repair work being carried out on the Humber Bridge is not being carried out on a 24-hour basis. [52969]

Mr. Spellar

After consultation with the local environmental health department, the Humber Bridge Board has decided to limit repair work to regular working hours during the week in order to reduce noise levels for local residents and in order to reduce repair costs. Resurfacing repairs should be completed by September 2002.